I-285/ SR 400 Project Open House: Feb 5th

Georgia DOT is holding an Open House for the I‐285/SR 400 Interchange Reconstruction project The proposed improvements include construction of barrier separated collector‐distributor (CD) lanes along I‐285 and SR 400, reconstruction of existing ramps, and construction of new flyover bridges, as well as reconstruction and widening of existing bridges in the interchange area.

-There will be no formal presentations at these meetings. The displays at both meeting times will be the same.

Bike Walk Dunwoody is asking that Pedestrian & Bicycle accommodations and space for a future Multi-Use trail network be provided in this project, as well as for the Collector-Distributor project along GA-400.

For details on our specific asks, contacts and the project details, please go here:

http://bikewalkdunwoody.org/news/call-for-action-gdot-400285-projects-add-trail-network-complete-streets/

Where: Congregation B’nai Torah
700 Mt. Vernon Road, Sandy Springs, GA 30328
When: February 5, 2015 11am to 1pm and 4pm to 8pm